Why Do You Need Revision Numbers on Fence Drawings?
If you’re new to submitting fence drawings as part of your bid proposals or submittal packages, you might not understand why you need revision numbers on fence drawings.
We’ve been doing fence drawings for nearly 25 years, and submitting them to architects, engineers and other construction professionals, so we’ve got some insight. Here’s what you need to know about what fence drawing revision numbers are and why we include them on our drawing generators.
What Are Fence Drawing Revision Numbers?
If you’ve ever looked closely at the title block on any kind of construction drawing, from site plans to details, you have probably seen a revision number.
If the drawing you are looking at is the first version that was issued of that particular drawing, the revision number will be 0, or often 00.
As changes to the drawing set are made, different sheets will get different revision numbers. So if you are looking at a drawing with the revision number 03, it’s the third version of that drawing after the original.
Fence drawing revision numbers work exactly the same way. Every time you make a change to your drawing and resubmit or reissue it, you would update the revision number to let everyone know that it is a revision, and which revision it is.
Why Would You Revise Fence Drawings?
The next thing you might be wondering about fence drawing revision numbers is why you would revise your fence drawings.
This often happens at your client’s request.
So, for instance, when you’re submitting a design drawing for approval prior to starting a project, your client might ask you to change the wall thickness, or they might decide to install a lower or higher fence.
Every time the design and specification of a fence on bigger jobs changes, the fence drawings should change too, and when that happens, you would use the same drawing title and number, but update the revision number so everyone knows it’s a new version of the same drawing.
You might also be asked to revise and resubmit fence and gate drawings if a change order has been issued.
Why Do We Use Fence Drawing Revision Numbers?
Now that you know what fence drawing revision numbers are, the next big question is why we do this.
The simplest answer to that is so that we can always be sure we’re working with the right version of our drawing.
Usually, fence drawing numbers don’t change. So if your drawing number is CL6BWO (and we’re going to talk about fence drawing naming conventions in another post!), when you submit or issue another version of that drawing, the drawing number itself would not change, which means people receiving that drawing might be confused by previous versions.
Imagine if you sent your crew to site with the wrong drawing!
This is part of something known as document control in the construction management world.
Instead of replacing documents and drawings with new versions and creating chaos, we issue revisions, so that everyone knows they are working with the right version, and also so that you can retain a historical record of what previous versions were, and what changes have been made.
Which Revision Number Should You Use On Your Fence Drawings?
If you've been asked to give your customer fence and gate drawings or a drawing set, then every drawing should start at 0, or usually 00. We usually use double digits because sometimes (not usually on fence projects though!) you could be asked for that many revisions.
Hopefully, you won't ever be in that situation!
If your client does ask for revisions of a particular drawing in your drawing set, only that revision number will change. So you could have several drawings that are revision number 00, others that are 01, 02, 03 and so on. Always increase the previous revision number by one, and you should be fine!
How to Add Revision Numbers to Your Fence Drawings
If you’re using Draw A Fence for your fence drawings, it’s super easy to add revision numbers to your fence drawings.
That’s because every drawing has a section that includes the project name, client name, drawing number, revision number and other important information. You can simply select your revision number from the drop down options and it will automatically be added to your drawing title block.
If you’re drawing fences from scratch, you will need to add revision numbers manually, and if you are using a template on CAD software for your fence drawings, there will usually be an area to add this.
If you’re using an outsourced freelancer to do your fence drawings, you will need to make sure that they know your drawing is an official revision (not simply a revision of a draft they’ve done for you) and which revision number should go on it.
If you need fast, easy, affordable fence and gate drawings that have revision numbers built in, try DrawAFence.com! It’s makes getting professional fence and gate drawings as easy as ordering online.